Gauldrock logoGauldrock
Case studies

Operational outcomes — measured the same way you measure projects.

Each engagement is reviewed against the operating numbers that matter: cycle time, capacity, and cost. Below are representative outcomes from recent client work.

Active engagements
20+
Avg. time to first value
< 90 days
Sectors
Civil · Infra · MEP
Regions
AU · US · UK · SEA
Case 01·Heavy Civil·Australia

Tier 1 Civil Contractor

Reduced weekly reporting time by 70% across 14 active projects

Problem

Project engineers spent a full day each week assembling weekly progress reports from email, programme updates, and site notes. Reports landed late and inconsistently.

Approach

We deployed a reporting pipeline that pulls from Procore, P6, and email, drafts the weekly report in the client's template, and routes it to PMs for review. Engineers approve, edit, and send.

Outcome

Reporting effort dropped from 8 hours to under 2 per project per week. Reports are now delivered on Monday morning, every week, in a consistent format.

Before / After

Reporting time saved

70%

Active projects

14

Engineer hours recovered / month

≈ 480

Case 02·Infrastructure·United Kingdom

National Infrastructure JV

Cut document retrieval from hours to seconds across 1.4M project documents

Problem

On a multi-billion JV, finding the right clause, RFI, or drawing revision routinely took engineers and commercial managers 1–3 hours per query.

Approach

We indexed the full project document set across SharePoint and Aconex into a construction-aware retrieval system, with role-based scoping and cited answers.

Outcome

Engineers and commercial teams now ask questions in plain English and get cited answers in seconds. Dispute response time on variations improved significantly.

Before / After

Documents indexed

1.4M

Avg. retrieval time

< 5s

Variation response time

−45%

Case 03·General Contractor·United States

Mid-Market Builder

Accelerated tender review by 55%, enabling 30% more bids per quarter

Problem

The estimating team was the bottleneck on growth. Each tender consumed a week of senior estimator time just on document intake and scope extraction.

Approach

We deployed tender intake automation that summarises documents, extracts scope by trade, flags exclusions and risks, and produces a structured handover pack for the estimator.

Outcome

Senior estimators now start pricing on day two instead of day six. Capacity to bid increased without adding headcount.

Before / After

Tender review time

−55%

Bids per quarter

+30%

New hires required

0

Case 04·Utilities·Australia

National Utilities Contractor

Accelerated billing preparation across 200+ field crews

Problem

Progress claims depended on field paperwork being collated, validated, and re-keyed into the ERP. The cycle ran 3–4 weeks behind site work.

Approach

We connected the mobile field app to ERP via an automation layer that validates field entries against scope, flags exceptions, and prepares draft claims for commercial review.

Outcome

Billing cycle compressed from 3–4 weeks to under 1 week. Working capital improved measurably across the portfolio.

Before / After

Billing cycle

−75%

Field crews

200+

Working capital impact

8 figures

Your project

Have a workflow you'd like to put through this lens?

If you can describe the workflow in three sentences, we can usually tell you within a week whether it's a good fit and what the first 60 days would look like.